BIPV solar projects have multiple options for rapid shutdown compliance

The module-level PV rapid shutdown compliance option in the 2017 National Electrical Code was a major shift from previous string-level rapid shutdown requirements. But module-level shutdown is just one of three ways a solar project can comply with current rapid shutdown requirements in the widely adopted 2017 code. A new 2020 code is beginning to…

The post BIPV solar projects have multiple options for rapid shutdown compliance appeared first on Solar Power World.